Our Projects

Please have a look at our past projects to have a better understanding of what our company can offer

2020 - on going

Picture24

GME-CI (TTWS) Joint Venture – MRT LINE 2

Supply, delivery, installation, testing and commissioning of electrical system (package 2).

GAMUDA M&E - Belfield Tunnel

GAMUDA M&E – Belfield Tunnel

Installation of HDPE PN10 pipe at Jalan Maharajalela.

2019 - on Going

S.N. Akmida - Project Mass Rapid Transit

S.N. Akmida – Project Mass Rapid Transit

Construction and completion of elevated stations and other associated works.

2019 - 2020

MMC-Gamuda---Water-Pipe-Relocation

MMC GAMUDA – Water Pipe Relocation

Relocation and reinstatement work of existing water pipes.

MMC-GAMUDA---Reinstatement-Work

MMC GAMUDA – Reinstatement Work

Reinstatement of TNB 11KV cable and associated works.

Picture14

CCCC – Utilities Relocation Work

Reinstatement of TNB 11KV cable and associated works.

CCCC - Genting Tunnel

CCCC – Genting Tunnel

Dismantle of External Electricity supply, Section 7.

2018 - 2020

YTL - DIVERSION OF WATER SUPPLY

YTL – Diversion of Water Supply

Electrified double track form Gemas to Johor Bahru.

CHEC-Construction---Drainage,-Sanitary-and-Cold-Water-System

CHEC Construction – Drainage, Sanitary and Cold Water System

Installation of embedded and pipe sleeves works.

2018 - 2019

Ikhmas-Jaya---Compact-Sub-station

Ikhmas Jaya – Compact Sub-station

Demolition works and completion of substructure works.

2018

CHEC Construction - SUKE Highway

CHEC Construction – SUKE Highway

Construction and completion of mainline and others associated works.

Picture8

CCCC – East Coast Rail Link (ECRL) Section 7

Electrical Installation works for Temporary Power Supply, Genting Tunnel Phase 2.

2017 - 2019

hpj-soild resistivity test2

George Kent Berhad – Earthing System Installation

Soil resistivity test for the new Hospital Block and Carpark for Hospital Putrajaya.

2017

mmc gamuda-piloting2

MMC GAMUDA – Piloting Works 2

Piloting works including breaking up existing road pavement, excavation of piloting trench, utilities detection, backfilling, and make good to original condition for Chan Sow Lin to Tun Razak Exchange, Titiwangsa to North Portal (TU1), and MMA Building 1& 1A.

Technical consultant to development of 6 blocks of office towers with 1,242 office units and high end commercial shopping spaces.

2016 - 2018

CHEC - UTILITY RELOCATION FOR SUKE HIGHWAY

CHEC – Utility Relocation for SUKE Highway

Mechanical coupling for Ø300 mm ductile iron (DI) pipe relocation project.

2016 - 2017

MAPLETREE INVESTMENTS PTE. LTD. - NANHAI BUSINESS CITY

Mapletree Investments PTE. LTD. – Nanhai Business City

HT equipment supply, installation, cable works and T&C for 22 blocks of high rise residential buildings, international schools and commercial spaces.

DANTECH - LANGAT 2 WATER TREATMENT PLANT

DANTECH – LANGAT 2 Water Treatment Plant

Cabling works, panels installation and earthing system for 2 x 6.6kV 5.5MW generating plant.

piloting-ampang park-mmc gamuda

MMC GAMUDA – Piloting Works

Backfilling works on the piloting trench along tunnel alignment for KL MRT Line 1 from Crossover 1 to Ampang Park Station.

mmc gamuda-relocation-sentul_west2

MMC GAMUDA – Utility Relocation

Relocation of TNB cable, DBKL’s lamp post, and associated works for KL MRT Line 1 at Sentul West Station.

MMC GAMUDA - INSTALLATION OF M&E SERVICES

MMC GAMUDA – Installation of M&E Services

Installation of M&E services for KL MRT Line 1 at Merdaka, Bukit Bintang and TRX Stations.

SINOHYDRO BUILDING S/B - RAPID PROJECT PACKAGE 2, PENGERANG

Sinohydro Building S/B – Rapid Project Package 2, Pengerang

Electrical works for building services, earthing/lighting and telecommunication system at Petronas Rapid Project Pengerang.

mmc gamuda-relocation-sentul_west2

Khidmat Hijau S/B – Pipe Works

Pipe works at Tanjung Kupang.

suke_meter-relocation

Water meter stand relocation.

suke-mscl-cutting

Pipe cutting for Ø450 mm mild steel cement lining (MSCL) pipe relocation project.

2016

Bengoh Dam

Gussmann Technologies Sdn. Bhd. – Bengoh Dam

Installation, integration of automation systems.

2015 - 2017

jiabang guojin

佛山市嘉邦置业有限公司 – THRIVE UNITED IFC

Technical consultant to development of 6 blocks of office towers with 1,242 office units and high end commercial shopping spaces.

2015

DESARU PIPEWORKS

DESARU Pipeworks

2013 - 2014

Southern Packaging CO. LTD

Southern Packaging CO. LTD.

佛山市南方包装有限公司

Provide solutions to solve their factory power usage and improve their systems.

2012

Pengurusan Aset Air

SEMANGAR Water Treatment Plant (Johor)

Improvement works for Taman University Reservoir.

Air Kelantan Sdn. Bhd. - Water Treatment Plant Wakaf Bunut (Kelantan)

Air Kelantan Sdn. Bhd. – Water Treatment Plant Wakaf Bunut (Kelantan)

Electrical, instrument and mechanical works.
Mechanical and pipe installation at chemical plant.

2011

TNB - HULU TERENGGANU HYDROELECTRIC PROJECT

TNB – HULU TERENGGANU Hydroelectric Project

Design, supply and installation of electric power supply construction camp.

KUB BERJAYA ENERGY SDN. BHD. - SANITARY LANDFILL (BUKIT TAGAR)

KUB Berjaya Energy Sdn. Bhd. – Sanitary Landfill (Bukit Tagar)

Construction, completion, T&C of 125 Kwp Solar power pilot. 

Pengurusan Aset Air

PAAB – JOHOR SEMANGAR Water Treatment Plant (Kota Tinggi)

Distribution works from Semangar water treatment plant to Bukit Kulai Reservoir and Lingiu supply system. 

2010

KTMB - ELECTRIFIED DOUBLE TRACK PROJECT IPOH TO PADANG BESAR

KTMB – Electrified Double Track Project

Supply, labor and machinery to relocate main water pipe at ROB13.

SAJ - LABIS WATER TREATMENT PLANT

SAJ – GERISIK Water Treatment Plant (Muar)

Improvement to Muar water supply system design, construction supply, T&C.

2009

Keretapi tanah melayu

Utilities Relocation – Batang Melaka to Gemas

TNB, TMB, water works and street lighting works.

2008

Loh & loh

Residential Development – Daerah Gombak

Development of 78 Semi-d houses and 9 Bungalow houses.

SAJ - LABIS WATER TREATMENT PLANT

SAJ – GRESIK Water Treatment Plant

Supply and installation of 11 KV VCB, transformer power cables and associated equipment.

2007

HITACHI

HITACHI Factory (Penang)

Supply and replacement of 11KV Switchgear.

SAJ - BANDAR TENGGARA Water Treatment Plant

SAJ – SEMANGAR Water Treatment Plant

Removal and transportation of 7 MVA transformer.

Puncak Niaga (M) Sdn. Bhd. - BUKIT TAMPOI Water Treatment Plant

Puncak Niaga (M) Sdn. Bhd. – BUKIT TAMPOI Water Treatment Plant

Relocation of power cable.
Laying new cable complete with cable connection, T&C.

2006

HITACHI

KOBE Precision Tech

Supply, installation and upgrading of existing 11 KV substation equipment.

SAJ - BANDAR TENGGARA WATER TREATMENT PLANT

SAJ – BANDAR TENGGARA Water Treatment Plant

Engineering works, T&C and building services.

Hampshire Serviced Apartments

Hampshire Serviced Apartments

Engineering works, supply, installation, T&C of standby generator sets and electrical services.

2005

kepong water treatment plant

SATU – KEPONG Water Treatment Plant

Engineering servies, electrical and civil modifications works. 
Provide instrumentation cabling works.

KOBE PRECISION TECH

HITACHI – KOBE PRECISION TECH

Supply and installation of 11 KV VCB, transformer power cables and associated equipment.

AOR_Terminal

SULTAN ABDUL SAMAD AIRPORT

Design, supply, installation and T&C of outdoor motor starter c/w all cabling works and earthing system.

2004

SAJ - LABIS WATER TREATMENT PLANT

SAJ – LABIS Water Treatment Plant

Engineering services, installation, instrumentation and cabling works.

ktmb electrified double track

KTMB

Electrified double track project between Rawang and Ipoh.
Tanjung Malin toll plaza and New Crossing street and traffic lighting installation works.

2003

NAZA Automative

NAZA Automative

Installation of HT and LT equipment, telephone, PA system, small power and lighting.
Design, supply and installation of low level steel structure and service rack.

Have a Project in Mind?
Let's Get Building!

Design and Build

Focus on Engineering, Procurement and Construction

INFRASTRUCTURAL - Refine Group

infrastructural

Able to do infrastructural works

BUILDING AUTOMATION AND SCADA

Building Automation and SCADA

Capability to provide full SCADA services

Mechanical and Electrical Engineering

The core field of our expertise

Copyright © Refine Group. All rights reserved.